Aged Built Up

Find your roofing system and desired warranty terms

AguaBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field
of the roof. Minimum millage requirements are 15 mils (0.015
inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 3 coats of MonoTop over the AguaBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

MonoBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

*Always Remove Rock

Brush, spray or roller apply 3 coats of MonoTop over the MonoBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

Applicable under solar arrays only. Call AguaSeal to review.

Concrete – Lightweight or Cast

AguaBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 3 coats of MonoTop over the AguaBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

Granulated Modified Bitumen

Find your roofing system and desired warranty terms

AguaBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 3 coats of MonoTop over the AguaBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

MonoBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

Brush, spray or roller apply 3 coats of MonoTop over the MonoBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

Applicable under solar arrays only. Call AguaSeal to review.

EPDM

MonoBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 3 coats of MonoTop over the MonoBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

PVC

Find your roofing system and desired warranty terms

AguaBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 3 coats of MonoTop over the AguaBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

MonoBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the PVC surface**

Brush, spray or roller apply 3 coats of MonoTop over the MonoBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

TPO

Find your roofing system and desired warranty terms

AguaBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 2 coats of MonoTop over the AguaBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

**Apply RoofBond Primer for cleansing and preparation of the EPDM surface**

Brush, spray or roller apply 3 coats of MonoTop over the AguaBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read AguaBase Application Sheet
Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

MonoBase System with MonoTop

10-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the TPO surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 70ft 2 /gal (1.5 gallons per square) over the entire field of the roof.

Minimum millage requirements are 11.5 mils (0.0115 inches / 0.292 millimeters) wet and 6.1 mils (0.0061 inches / 0.155 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 12.2 mils (0.0122 inches / 0.31 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be necessary to apply 1 coat of MonoTop at the above specified coverage rate. 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

15-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the TPO surface**

Brush, spray or roller apply 2 coats of MonoTop over the MonoBase System at a combined total rate of 50ft 2 /gal (2 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 15 mils (0.015 inches / 0.403 millimeters).

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

20-year Renewable Warranty:
Material Only or Labor & Material

**Apply AguaGrip Primer to set the TPO surface**

Brush, spray or roller apply 3 coats of MonoTop over the MonoBase System at a combined total rate of 30ft 2 /gal (3 gallons per square) over the entire field of the roof.

Minimum millage requirements are 15 mils (0.015 inches / 0.389 millimeters) wet and 7.5 mils (0.0075 inches / 0.206 millimeters) dry per coat. Allow to dry between coats. Total MonoTop dry thickness should be a minimum of 22.5 mils (0.0225 inches / 0.603 millimeters).

Note: 20 year warranties require that the first coat of MonoTop be an alternate color relative to the final 2 MonoTop coats, ie; 1 coat of Dove Grey/Cotton color and 2 coats of White.

If the Specifier opts to utilize HardTop over the MonoTop to create a hard, glossy finish, it shall only be required to apply 2 coats of MonoTop at the above mentioned coverage rates, and then 2 coats of HardTop should be applied over the MonoTop at the coverage rate of 120 square feet per gallon, per coat/ or 1.2 gallons per square.

Read MonoTop Application Sheet

Applicable under solar arrays only.
Call AguaSeal to review.

Metal Roof

Coming Soon